Study Figure 3 which is a hydrograph showing the changing discharge of the River Thames at Kingston during a major flood event.
Figure 3
☐ | A | Discharge exceeded 500 cumecs for over 20 days. | |
☐ | B | Peak discharge was 1000 cumecs higher than discharge on Day 1. | |
☐ | C | Peak discharge was over 20 times higher than discharge on Day 1. | |
☐ | D | Discharge was highest on Day 58. |
(2)
Did this page help you?